Skip to content
Coming soon

Electrical: disconnect, fusing, and interconnection

Landing conductors through the integrated disconnect, coupling with the inverter, and the interconnection paperwork.

Updated September 1, 2026RAE Charge

This guide is not written yet. The outline below shows what it will cover. Installer partners can request early drafts.

This guide is being written with RAE's certification partners and will publish with the installation manual.

What it will cover

  • The integrated disconnect and fuse protection in RAE Charge, and how they fit the site's protection scheme.
  • Coupling scenarios with the inverter architecture the site uses.
  • Conductor sizing and termination tables.
  • A permitting and interconnection checklist for the authority having jurisdiction.
  • Labelling and documentation for inspection.

Installer partners can request early drafts through the contact page.

Installer partners

Questions this guide does not answer yet?

Send them to the RAE team. They shape which guides we write next.