Coming soon
Electrical: disconnect, fusing, and interconnection
Landing conductors through the integrated disconnect, coupling with the inverter, and the interconnection paperwork.
Updated September 1, 2026RAE Charge
This guide is not written yet. The outline below shows what it will cover. Installer partners can request early drafts.
This guide is being written with RAE's certification partners and will publish with the installation manual.
What it will cover
- The integrated disconnect and fuse protection in RAE Charge, and how they fit the site's protection scheme.
- Coupling scenarios with the inverter architecture the site uses.
- Conductor sizing and termination tables.
- A permitting and interconnection checklist for the authority having jurisdiction.
- Labelling and documentation for inspection.
Installer partners can request early drafts through the contact page.